An eligible NSW business installing a battery may be able to reduce its upfront cost through BESS4, an activity under the Peak Demand Reduction Scheme. The incentive is usually reflected in the installation quote through an Accredited Certificate Provider, rather than paid as a fixed government cash rebate.
Which systems can qualify
BESS4 covers qualifying batteries with usable capacity greater than 20 kWh and no more than 200 kWh. Residential buildings and data centres are excluded. A site that has already received a BESS4 or BESS5 implementation cannot claim another under those activities.
The selected equipment, installer, warranty, internet connectivity and demand-response capability must meet the scheme requirements. Planning and network approvals also need to be in place. The inverter must be appropriately sized for the battery; capacity alone does not establish eligibility.
The minimum contribution
The purchaser must pay a net amount of at least $5,000 excluding GST per BESS4 implementation. The payment relied on for eligibility must not be reimbursed. Any finance, lease or power purchase arrangement should be checked with the Accredited Certificate Provider before a discount is offered.
New solar can increase the discount
Installing new solar is not a blanket requirement for BESS4. Eligible battery-only projects can receive an incentive. A higher calculation rate can apply when qualifying new or additional solar is installed within 90 days before or after the battery.
For that higher rate, the new solar capacity in kW must be at least one-quarter of the battery’s usable capacity in kWh. For example, a battery with 100 kWh of usable capacity would require at least 25 kW of qualifying new solar. Existing solar on its own does not meet this new-solar condition.
Start with the electricity bill
UEH reviews electricity bills, interval data, existing solar and site constraints before recommending a system. Your proposal should distinguish the installed cost, estimated incentive, customer contribution and forecast savings. The discount depends on the eligible design and certificate value, so it must be confirmed for the individual project.
Explore our NSW battery services | Request a battery assessment
Scheme information checked on 23 October 2026. Eligibility and incentive values are subject to the current rules and project assessment.
Further information: NSW Government battery incentive guidance | Current PDRS Rule