Choosing between NSW BESS3 BESS4 and BESS5
Building type and usable battery capacity determine which NSW incentive pathway to assess. Compare the three activities before choosing a system.
NSW’s Peak Demand Reduction Scheme has separate battery installation activities for apartment buildings and businesses. Choosing the right pathway starts with the building and its electricity needs.
| Activity | Intended site | Usable battery capacity |
| BESS3 | Eligible apartment buildings with at least four dwellings | More than 20 kWh to 200 kWh |
| BESS4 | Eligible small and medium business installations | More than 20 kWh to 200 kWh |
| BESS5 | Eligible commercial and industrial installations | More than 200 kWh to 30 MWh |
BESS3 for apartment buildings
BESS3 supports a shared battery serving common property loads, multiple dwellings or both. The battery must be installed outdoors, and strata approvals, metering and the way benefits are shared need attention before installation. A minimum purchaser payment of $1,000 excluding GST applies per implementation.
BESS4 for businesses
BESS4 can suit businesses such as medical centres, warehouses and hospitality venues. It requires a minimum purchaser payment of $5,000 excluding GST per implementation. Residential buildings and data centres are excluded, and eligible products and installers must be used.
BESS5 for larger installations
BESS5 covers larger batteries installed behind the meter. Its incentive calculation is capped at the first 10 MWh and is also limited by inverter output. The battery must meet the specified UL9540A testing and performance requirements. Unlike BESS3 and BESS4, BESS5 has no scheme minimum purchaser payment.
Compare the design as well as the discount
The capacity bands refer to usable capacity recognised under the scheme, which may differ from a product’s advertised nominal capacity. Inverter output, approvals and control capability also affect eligibility. A site cannot receive successive BESS4 and BESS5 implementations.
New solar is not compulsory for every eligible project. Qualifying new or additional solar installed within 90 days of the battery can increase the incentive, subject to the activity’s conditions. The system should still be sized around energy use, site limits and the intended operating strategy.
UEH can assess your site and coordinate the technical and incentive checks with an Accredited Certificate Provider before you commit.
Discuss your NSW battery project
Scheme information checked on 23 October 2026. Final eligibility and discounts require project-specific assessment.
Further information: NSW Government apartment battery guidance | NSW Government business battery guidance | IPART activity requirements and Rule changes | Current PDRS Rule