A 5 MW / 11 MWh LFP battery energy storage system in Naracoorte, South Australia, delivered end to end by United Energy Hub as EPC contractor, from foundations to energisation in 10 months.
UEH’s role: design and engineering, procurement, civil works and installation,
HV/LV electrical, protection, 33 kV grid connection and commissioning. Delivered with BJEI Australia, using Sungrow PCS and battery equipment.